How to turn the Pit into the holding tanks

The people of Alavanyo Agome have now started to line the pit that will form the base of the community latrine. Ladies carry water from a supply 200m away and sand from a stockpile 400m away. Using the smashed up rocks excavated from the pit, sand, cement and water the men mix the concrete by hand. Masons supplied by the village development committee then get to work. The first task is to get a level base. Getting this correct is vital for the strength of the whole construction. Because they are working directly on bed rock they do not need to dig foundations. The cement blocks that were made last year have cured and are really strong, but heavy!

All of this labour is provided by the village as their contribution to their community toilet.

Sand and water being carried to the site
It’s always amazing to watch the accuracy of pouring the water into the drum

This sand seems to be defying gravity.

Concrete mixing by hand. Hard work.
The blocks made last year are now going to make the walls of the holding tanks.
Getting the level correct