The library ceiling goes up

The first job in renovating the library for the communities of Alavanyo is to put the ceiling up. All of the holes allowing bats to get into an enclosed ceiling space are now blocked so the ceiling can go up. In mitigation of depriving the bats of a comfortable roost we are investigating the possibility of using any left-over pieces of wood from the furniture building to make some bat boxes to put up in the school grounds.

Does anyone have the dimensions needed for a bat box?

Measuring ceiling strips
Cutting the strip

Fitting the first strip

The first strips are fitted in small pieces as the ceiling is wider than the full length of the strips. The full length strips will then cover the rest of the ceiling.

Fixing the holder for the main ceiling strips
The strips then go up easily.
The ceiling is finished

Loading

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.