Work started again but then Rain Stopped Play

It’s been a while since the community of Alavanyo Agome have been able to work on their communal toilet block. But after purchasing all of the planking and having it delivered work can once again get started. There needs to be a cast concrete floor over the half of the septic tank to fit the squatting plate or situpon toilet. The first step is to fix shuttering to hold the poured concrete.

The carpenters have arrived to fix the shuttering on the septic tanks. This will allow Clemence to cast the very strong slabs in the cubicles. But just as they had the initial planking fitted the heavens opened and they were rained off.

Bringing the planking form the wood store.
All by hand, and head.
The first to be fitted
Accuracy is vital. No one wants to fall in.
Everything needs to be just so.
Then the heavens opened

Loading